Welcome/Home
shelter-2009
restart-2010

Looking upward under the eve.

Progress stopped for winter weather, inside, eves, door and window frames scheduled for spring, 2011.

A small winter project will be to use this flat wall to draw plans for rain gutters and an elevated tank that connects to a sink inside. An elevated tank would be too small to hold all the rainwater from a large storm, excess water would overflow to a larger tank nearby.

End of 2010 photo series, return to main site index, Welcome/Home